Upstairs is more of a normal situation, still lots to do but you can get a sense of what it will look like in a couple of months [touch wood]. First pic left is the door from the stair landing into the hallway. Second left is from inside the radio staff meeting room, the other is the hall way with mechanical and lift doors to left and door to storage area right.
Back to the water line break: The school is closed this morning, there is a small hole dug up where they think the brake is, this morning the council guys are down on the main road uncovering a man hole there. Slow going digging through frozen ground with a small gas powered jack hammer, the past several years have not seen any problems in main lines so I guess there was not need for a larger hammer, time will tell if this needs a re visit.
We are looking at some nice temperatures this week, minus mid teens for the lows and mostly sunny, time to get the snow shoes on me thinks.
No comments:
Post a Comment