The second photo is top floor, the hall way will extend to end with the electrical room and the radio department running off it.
The one thing that is still an issue is getting the concrete poured on the bottom floor, lots of hanky panky going on with the contractor and the consulting engineers there, very unsatisfactory behaviour IMO.
Temperatures are up to +4, snow melting, forecast not looking too bad, bit of snow here n there, not too cold, says I with fingers crossed..
1 comment:
Hello Brian!
Just wanted to say thanks for the regular updates on the Media Centre construction (and all of the other stuff Labrador!) I've been following it regularly. It is great being able to see it grow.
Patrick Nagle
Iqaluit
Post a Comment