Ha ha ha, I mean erection of walls of the New Media Centre.
The lads started yesterday morning on the frames, cutting out and assembly. They are working on the two centre load bearing walls now, and then will put in second floor joists before sheaving the outside of the bottom floor. Will get the bottom floor covered in as much as possible before getting ready for the concrete floor.
The archival room will have a concrete ceiling, this to be done before the floor, there is some smaller concrete pads for outside too.
So all things being equal we should see some dramatic progress now, says I wit me fingers crossed.
No comments:
Post a Comment